top of page

Electrical Testing & Commissioning

  • 1 hour
  • Price on Inspection
  • Customer's Place

Service Description

Badan Highrise can carry out inspections in order to verify that the low voltage installation complies with the design drawings, the specification and the relevant local and international requirements. All test activities will be recorded on our acceptance sheets and can be witnessed by the accepting authority. This information is invaluable and will ensure that all your systems are fit for purpose and safe. Currently we are conducting the following low voltage testing services for our clients:- - "Cold" Testing – Insulation Resistance Testing - "Live" Testing – Loop Impedance Testing - Switchboard/ Final DB’s testing (including ELCB testing) - Continuity and polarity testing of final light and power circuits


bottom of page